All states / California / B / Study guide

How to pass the California General Building exam

A study guide for the California General Building exam: what it covers, how much each section counts, the rules that come up most, and a study plan. Rules below link to their official source wherever one exists.

The exam at a glance

  • Computer-based, multiple choice with four answer choices and one best answer.
  • 3½ hours for each exam, trade and Law & Business (CSLB exam FAQ). CSLB does not publish the number of questions or the passing score.
  • Closed book: no reference materials; a calculator is provided.
  • Most applicants also take the Law & Business exam (included free with every trade exam here).

Source: CSLB B study guide. Always confirm details with CSLB before test day.

What's on the exam

  • Core Trades30%
  • Framing & Structural20%
  • Finish Trades20%
  • Planning & Estimating15%
  • Safety15%

Section weights from the official exam outline. Bigger sections are worth more points, so study them first.

A 4-step study plan

  1. Take a baseline test. Answer a full mock exam before studying so you know where you stand in each section.
  2. Study by weight, then by weakness. Start with Core Trades (30%), Framing & Structural (20%), Finish Trades (20%), then move to whichever sections scored lowest on your baseline.
  3. Learn the rule, not just the answer. For every miss, read the explanation and the code section or statute it cites; on test day you'll need to know these references well.
  4. Repeat mock exams until you're consistently at 80% or more, which gives you a cushion above the passing score. Retake the questions you missed until they stick.

Key rules to know, by section

A few of the facts that come up in each section, with the answer and the source. The full course has 2,228 questions with explanations.

Core Trades 30% of the exam · 354 practice questions

Framing & Structural 20% of the exam · 218 practice questions

  • Minimum stairway headroom (CRC)? 6 ft 8 in. Rule (CRC §R318.7.2): headroom in stairways must be at least 6 ft 8 in, measured vertically from the sloped line connecting the tread nosings (or from the landing) to the ceiling or any soffit above. Calif. Residential Code §R318.7.2 (stair headroom 6 ft 8 in) ↗
  • Siding nails should be? Corrosion-resistant (galvanized). Rule (CRC §R703.3.3): fasteners for exterior wall coverings must be corrosion-resistant, such as hot-dip galvanized, stainless steel or aluminum. Plain steel nails rust and stain the siding and lose holding power.
  • A round handrail's grip diameter must be? 1-1/4 to 2 in. Rule (CRC §R320.6): a Type I handrail with a circular cross section must have an outside diameter of at least 1-1/4 inches and no more than 2 inches, so it can be gripped firmly. Calif. Residential Code §R320.6 (handrail grip size) ↗

Finish Trades 20% of the exam · 203 practice questions

  • Where tile meets a change of plane (inside corner, tub edge), you should use? Flexible sealant (caulk). Rule (TCNA Handbook, EJ171): movement joints are required where tile meets a change of plane, such as inside corners, tub edges and where walls meet floors. Fill them with flexible sealant (caulk), not grout, so the tile can move without cracking.
  • Typical drywall screw spacing on ceilings? 12 in. Rule (CRC Table R702.3.5): on ceilings, gypsum board screws are spaced 12 inches on center (nails 7 inches), closer than on walls because the board's weight pulls straight down on the fasteners.
  • When hanging a prehung door, shims go at? The hinges and the strike. When hanging a prehung door, shim behind the hinges and at the strike (latch) location, keeping the jamb plumb and straight. Shims at those load points keep the door from sagging and make the latch line up; fasten through the shims into the framing.

Planning & Estimating 15% of the exam · 127 practice questions

  • Gypsum board delivered to the job should be stored? Flat, off the ground, dry and covered. Store gypsum board flat on a level surface, off the ground on supports, and keep it dry and covered. Leaning sheets against a wall can bow them, and moisture weakens the core and causes mold.
  • Minimum floor area of a habitable room (other than kitchens)? 70 sq ft. Rule (CRC §R312.1 and §R312.2): habitable rooms must have at least 70 sq ft of floor area (kitchens excepted) and may not be less than 7 feet in any horizontal dimension. Calif. Residential Code §R312.1 (habitable room 70 sq ft) ↗
  • On drawings, 'TYP.' next to a detail means? Typical, same at similar locations. TYP. means 'typical': the same detail or dimension applies at every similar location on the drawings, even though it is drawn only once.

Safety 15% of the exam · 161 practice questions

  • Before working on a circuit, the safe practice is? Lockout/tagout and verify zero energy. Rule (Cal/OSHA Title 8 §2320.4): before working on de-energized electrical equipment, disconnect it, lock and tag the disconnecting means, and test to verify that no voltage is present. Cal/OSHA Title 8 §2320.4 (lockout of de-energized electrical equipment) ↗
  • Before removing a non-load-bearing wall, you should check it for? Wiring, plumbing and ducts inside. Even a non-load-bearing wall can hide electrical wiring, plumbing pipes, gas lines and HVAC ducts. Check before cutting, turn off and disconnect any utilities, and reroute or cap them properly.
  • Cal/OSHA generally requires fall protection in construction when a worker could fall more than? 7-1/2 ft. Rule (Cal/OSHA Title 8 §1670): in construction, fall protection (guardrails, personal fall arrest or restraint, or nets) is required where employees could fall more than 7-1/2 feet from the perimeter, unprotected sides and edges, openings, or roofs steeper than 7:12. Cal/OSHA Title 8 §1670 (personal fall arrest — over 7-1/2 ft) ↗

The Law & Business exam

Most California applicants also take the Law & Business exam. Its sections:

  • Contracts21%
  • Employment20%
  • Business finances15%
  • Safety14%
  • Licensing13%
  • Insurance & liens12%
  • Public works5%

Contracts 21% of the exam · 257 practice questions

  • A homeowner under 65 who signs a home improvement contract at home can cancel within? 3 business days. Rule (Civil Code §1689.6 and §7159): a buyer who signs a home improvement contract at home generally has 3 business days to cancel; the contract must include the Three-Day Right to Cancel notice. Seniors 65 and older get 5 business days. Civil Code §1689.6 (3-day right to cancel) ↗
  • Statute of limitations to sue on a written contract in California? 4 years. Rule (Code of Civil Procedure §337): a lawsuit for breach of a written contract must be filed within 4 years after the breach. Oral contracts have a shorter 2-year limit (CCP §339). Code of Civil Procedure §337 (written contracts) ↗

Employment 20% of the exam · 241 practice questions

  • An employee quits without notice. Final wages are due within? 72 hours. Rule (Labor Code §202): an employee who quits without giving at least 72 hours' notice must be paid within 72 hours. If the employee gave 72 hours' notice or more, final wages are due on the last day of work. Labor Code §202 (final pay within 72 hours) ↗
  • Each paycheck must include? An itemized wage statement. Rule (Labor Code §226): with each paycheck, employers must give an itemized wage statement showing gross wages, total hours worked, all deductions, net wages, the pay period dates, the employee's name and last 4 digits of the SSN or an ID number, the employer's name and address, and all hourly rates with hours at each rate. Labor Code §226 (itemized wage statement) ↗

Business finances 15% of the exam · 147 practice questions

  • Which statement shows the business's financial position at one point in time? Balance sheet. The balance sheet is a snapshot on one date. It lists what the business owns (assets), what it owes (liabilities) and the owners' equity, and it always balances: assets = liabilities + equity.
  • The sales volume where revenue exactly covers all costs is the? Break-even point. The break-even point is the sales volume at which total revenue equals total costs (fixed plus variable), so profit is zero. Above break-even each sale adds profit; below it the business loses money.

Safety 14% of the exam · 158 practice questions

  • Information on hazards of a chemical product is found on its? Safety Data Sheet (SDS). Rule (Title 8 §5194, Hazard Communication): manufacturers must provide a Safety Data Sheet (SDS) for every hazardous chemical, and employers must keep SDSs readily accessible to workers on each shift. Cal/OSHA Title 8 §5194 (Hazard Communication, safety data sheets) ↗
  • When a ladder is used to reach an upper landing, its side rails must extend at least how far above the landing? 3 feet. Rule (29 CFR §1926.1053(b)(1); Cal/OSHA has the same rule): portable ladder side rails must extend at least 3 feet above the upper landing, or the ladder must be secured with a grab rail, so the worker has a handhold getting on and off. 29 CFR §1926.1053 (ladder 3 ft above landing) ↗

Licensing 13% of the exam · 152 practice questions

  • An expired license can be renewed (without reapplying) for up to how long after it expires? 5 years. Rule (B&P §7141): an expired (delinquent) license can be renewed within 5 years after it expires by paying the renewal and delinquency fees. After 5 years it cannot be renewed and the business must apply for a new license, including any required exams. Bus. & Prof. Code §7141 (renewal within five years) ↗
  • A lawsuit for a latent (hidden) construction defect must generally be filed within how many years of substantial completion? 10 years. Rule (Code of Civil Procedure §337.15): a lawsuit for a latent (hidden) construction defect must be filed within 10 years after substantial completion. Patent (obvious) defects fall under the shorter 4-year limit in CCP §337.1. Code of Civil Procedure §337.15 (10 years for latent defects) ↗

Insurance & liens 12% of the exam · 145 practice questions

  • An owner must record a notice of completion within how many days after completion? 15. Rule (Civil Code §8182): an owner's notice of completion must be recorded within 15 days after completion of the work of improvement; a notice recorded later is not valid, and the longer 90-day lien periods then apply. Civil Code §8182 (notice of completion) ↗
  • After receiving a progress payment, a prime contractor must pay its subcontractors within? 7 days. Rule (B&P §7108.5): a prime contractor must pay each subcontractor its share of a progress payment within 7 days after receiving it, unless the parties agreed otherwise in writing. Late payment carries a penalty of 2% per month on the amount due. Bus. & Prof. Code §7108.5 (prompt payment to subs) ↗

Public works 5% of the exam · 65 practice questions

  • A public works payment bond is required when the contract exceeds? $25,000. Rule (Civil Code §9550): a direct contractor awarded a public works contract over $25,000 must give the public entity a payment bond before work starts, guaranteeing payment to subcontractors, laborers and suppliers. Civil Code §9550 (public works payment bond) ↗
  • The annual DIR public works contractor registration fee is? $400. Rule (Labor Code §1725.5): contractors and subcontractors must register with the Department of Industrial Relations before bidding on or performing public works, and pay an annual registration fee — currently $400 — renewed every year (or up to three years at once). Labor Code §1725.5 (DIR registration) ↗

Questions people ask

What is on the California General Building exam?

The exam is weighted by section: Core Trades 30%, Framing & Structural 20%, Finish Trades 20%, Planning & Estimating 15%, Safety 15%.

What is the format of the California General Building exam?

Computer-based, multiple choice with four answer choices and one best answer. 3½ hours for each exam, trade and Law & Business (CSLB exam FAQ). CSLB does not publish the number of questions or the passing score. Closed book: no reference materials; a calculator is provided. Most applicants also take the Law & Business exam (included free with every trade exam here).

What should I study first for the California General Building exam?

Start with the largest sections, which carry the most points: Core Trades (30%), Framing & Structural (20%), Finish Trades (20%). Then take a timed mock exam and spend extra time on whatever scored lowest.

Do I also need the Law & Business exam?

Most applicants for this license also take the Law & Business exam. It is included with this course, so you can practice both.

Where can I practice for the California General Building exam?

LicenseExamReady has 2,228 practice questions for the California General Building exam and the Law & Business exam, full mock exams weighted like the real test, explanations that cite the code section or rule, and a readiness score. New accounts get a free 3-day trial.

Are practice questions the same as the real exam?

No. Licensing boards keep their exams confidential. Good practice questions are written from the official exam outline and code books and teach the rule behind each answer.

Practice for the California General Building exam

2,228 practice questions, full-length timed mock exams weighted like the real test, explanations with sources, and a readiness score that shows when you're ready to book the exam.

LicenseExamReady is an independent study tool, not affiliated with Contractors State License Board. How our questions are made.