The exam at a glance

  • Computer-based, multiple choice with four answer choices and one best answer.
  • 3½ hours for each exam, trade and Law & Business (CSLB exam FAQ). CSLB does not publish the number of questions or the passing score.
  • Closed book: no reference materials; a calculator is provided.
  • Most applicants also take the Law & Business exam (included free with every trade exam here).

Source: CSLB C-20 study guide. Always confirm details with CSLB before test day.

What's on the exam

  • Fabrication, Installation & Startup38%
  • Planning & Estimating22%
  • Troubleshooting, Repair & Maintenance20%
  • Safety20%

Section weights from the official exam outline. Bigger sections are worth more points, so study them first.

A 4-step study plan

  1. Take a baseline test. Answer a full mock exam before studying so you know where you stand in each section.
  2. Study by weight, then by weakness. Start with Fabrication, Installation & Startup (38%), Planning & Estimating (22%), Troubleshooting, Repair & Maintenance (20%), then move to whichever sections scored lowest on your baseline.
  3. Learn the rule, not just the answer. For every miss, read the explanation and the code section or statute it cites; on test day you'll need to know these references well.
  4. Repeat mock exams until you're consistently at 80% or more, which gives you a cushion above the passing score. Retake the questions you missed until they stick.

Key rules to know, by section

A few of the facts that come up in each section, with the answer and the source. The full course has 2,185 questions with explanations.

Fabrication, Installation & Startup 38% of the exam · 400 practice questions

  • A condensate drain line should slope at least? 1/8 in per ft. Rule (CMC §310.1): condensate must be collected and discharged to an approved fixture or disposal area through an indirect waste pipe sloped at least 1/8 inch per foot (1%). Calif. Mechanical Code §310.1 (condensate drain slope 1/8 in per ft) ↗
  • A Category I gas appliance vents with? Non-positive pressure, non-condensing. Rule (CMC §202 definitions): a Category I appliance operates with non-positive vent static pressure and with flue gases hot enough to avoid condensation in the vent, so it can use Type B vent. Category IV is positive pressure and condensing. Calif. Mechanical Code §202 definitions (Category I appliance) ↗
  • A system with a TXV is usually charged using? Subcooling. A TXV adjusts itself to hold a constant superheat, so superheat can't show the charge. On TXV systems the charge is checked by subcooling, against the manufacturer's target.

Planning & Estimating 22% of the exam · 226 practice questions

  • On a psychrometric chart, when dry-bulb and wet-bulb temperatures are equal, relative humidity is? 100%. When the dry-bulb and wet-bulb temperatures are equal, no water can evaporate from the wet-bulb wick, which means the air is saturated: 100% relative humidity. The dew point equals both readings.
  • Which factor does NOT directly affect a Manual J load calculation? The color of the thermostat. A Manual J calculation depends on things that affect heat flow: the building envelope (insulation, windows), orientation and shading, infiltration, duct location, local design temperatures, and occupants and appliances. Thermostat color has no effect.
  • Unless the customer has a special need, what indoor dry-bulb temperature does Manual J use for the summer cooling design condition? 75°F. Practice: Manual J uses 75°F indoors for cooling (about 50% RH) and 70°F for heating. Using a colder indoor setpoint makes the calculated cooling load too large.

Troubleshooting, Repair & Maintenance 20% of the exam · 203 practice questions

  • Low suction pressure, high superheat and low subcooling usually indicate? A refrigerant undercharge. Low suction pressure, high superheat and low subcooling together mean there isn't enough refrigerant in the system. Since refrigerant doesn't get used up, find and repair the leak, then charge.
  • Total external static pressure that is too high indicates? Restrictive ducts, filters or coils. When total external static pressure is above the equipment's rating, the ducts, filters or coils are too restrictive. Airflow drops, which cuts capacity and efficiency and can freeze coils or overheat furnaces.
  • A TXV system shows low suction pressure, high superheat and high subcooling. Indoor airflow is correct. What is the most likely problem? A restriction in the liquid line or metering device. Practice: A restriction starves the evaporator (low suction, high superheat) while liquid backs up in the condenser (high subcooling). An undercharge also gives high superheat, but subcooling would be low.

Safety 20% of the exam · 191 practice questions

  • Nitrogen cylinders used for pressure testing must be used with? A pressure regulator (and relief valve). Nitrogen cylinders are filled to over 2,000 psi, far above what refrigeration systems can handle. Always use a pressure regulator (and relief valve) to reduce the pressure to the test value.
  • An extension ladder to a roof must extend at least how far above the roof edge? 3 ft. Rule (Cal/OSHA Title 8 §3276): a ladder used to reach a roof must extend at least 36 inches (3 ft) above the roof edge (landing), so the worker has a handhold getting on and off. Cal/OSHA Title 8 §3276 (portable ladders) ↗
  • Natural gas leaks should be checked with? Soap solution or a gas detector. Check gas connections with soap solution (noncorrosive leak detection fluid) or an approved electronic gas detector. Never use a flame (CPC §1213.4.1).

The Law & Business exam

Most California applicants also take the Law & Business exam. Its sections:

  • Contracts21%
  • Employment20%
  • Business finances15%
  • Safety14%
  • Licensing13%
  • Insurance & liens12%
  • Public works5%

Contracts 21% of the exam · 257 practice questions

  • A homeowner under 65 who signs a home improvement contract at home can cancel within? 3 business days. Rule (Civil Code §1689.6 and §7159): a buyer who signs a home improvement contract at home generally has 3 business days to cancel; the contract must include the Three-Day Right to Cancel notice. Seniors 65 and older get 5 business days. Civil Code §1689.6 (3-day right to cancel) ↗
  • Statute of limitations to sue on a written contract in California? 4 years. Rule (Code of Civil Procedure §337): a lawsuit for breach of a written contract must be filed within 4 years after the breach. Oral contracts have a shorter 2-year limit (CCP §339). Code of Civil Procedure §337 (written contracts) ↗

Employment 20% of the exam · 241 practice questions

  • An employee quits without notice. Final wages are due within? 72 hours. Rule (Labor Code §202): an employee who quits without giving at least 72 hours' notice must be paid within 72 hours. If the employee gave 72 hours' notice or more, final wages are due on the last day of work. Labor Code §202 (final pay within 72 hours) ↗
  • Each paycheck must include? An itemized wage statement. Rule (Labor Code §226): with each paycheck, employers must give an itemized wage statement showing gross wages, total hours worked, all deductions, net wages, the pay period dates, the employee's name and last 4 digits of the SSN or an ID number, the employer's name and address, and all hourly rates with hours at each rate. Labor Code §226 (itemized wage statement) ↗

Business finances 15% of the exam · 147 practice questions

  • Which statement shows the business's financial position at one point in time? Balance sheet. The balance sheet is a snapshot on one date. It lists what the business owns (assets), what it owes (liabilities) and the owners' equity, and it always balances: assets = liabilities + equity.
  • The sales volume where revenue exactly covers all costs is the? Break-even point. The break-even point is the sales volume at which total revenue equals total costs (fixed plus variable), so profit is zero. Above break-even each sale adds profit; below it the business loses money.

Safety 14% of the exam · 158 practice questions

  • Information on hazards of a chemical product is found on its? Safety Data Sheet (SDS). Rule (Title 8 §5194, Hazard Communication): manufacturers must provide a Safety Data Sheet (SDS) for every hazardous chemical, and employers must keep SDSs readily accessible to workers on each shift. Cal/OSHA Title 8 §5194 (Hazard Communication, safety data sheets) ↗
  • When a ladder is used to reach an upper landing, its side rails must extend at least how far above the landing? 3 feet. Rule (29 CFR §1926.1053(b)(1); Cal/OSHA has the same rule): portable ladder side rails must extend at least 3 feet above the upper landing, or the ladder must be secured with a grab rail, so the worker has a handhold getting on and off. 29 CFR §1926.1053 (ladder 3 ft above landing) ↗

Licensing 13% of the exam · 152 practice questions

  • An expired license can be renewed (without reapplying) for up to how long after it expires? 5 years. Rule (B&P §7141): an expired (delinquent) license can be renewed within 5 years after it expires by paying the renewal and delinquency fees. After 5 years it cannot be renewed and the business must apply for a new license, including any required exams. Bus. & Prof. Code §7141 (renewal within five years) ↗
  • A lawsuit for a latent (hidden) construction defect must generally be filed within how many years of substantial completion? 10 years. Rule (Code of Civil Procedure §337.15): a lawsuit for a latent (hidden) construction defect must be filed within 10 years after substantial completion. Patent (obvious) defects fall under the shorter 4-year limit in CCP §337.1. Code of Civil Procedure §337.15 (10 years for latent defects) ↗

Insurance & liens 12% of the exam · 145 practice questions

  • An owner must record a notice of completion within how many days after completion? 15. Rule (Civil Code §8182): an owner's notice of completion must be recorded within 15 days after completion of the work of improvement; a notice recorded later is not valid, and the longer 90-day lien periods then apply. Civil Code §8182 (notice of completion) ↗
  • After receiving a progress payment, a prime contractor must pay its subcontractors within? 7 days. Rule (B&P §7108.5): a prime contractor must pay each subcontractor its share of a progress payment within 7 days after receiving it, unless the parties agreed otherwise in writing. Late payment carries a penalty of 2% per month on the amount due. Bus. & Prof. Code §7108.5 (prompt payment to subs) ↗

Public works 5% of the exam · 65 practice questions

  • A public works payment bond is required when the contract exceeds? $25,000. Rule (Civil Code §9550): a direct contractor awarded a public works contract over $25,000 must give the public entity a payment bond before work starts, guaranteeing payment to subcontractors, laborers and suppliers. Civil Code §9550 (public works payment bond) ↗
  • The annual DIR public works contractor registration fee is? $400. Rule (Labor Code §1725.5): contractors and subcontractors must register with the Department of Industrial Relations before bidding on or performing public works, and pay an annual registration fee — currently $400 — renewed every year (or up to three years at once). Labor Code §1725.5 (DIR registration) ↗

Questions people ask

What is on the California C-20 Warm-Air Heating, Ventilating and Air-Conditioning exam?

The exam is weighted by section: Fabrication, Installation & Startup 38%, Planning & Estimating 22%, Troubleshooting, Repair & Maintenance 20%, Safety 20%.

What is the format of the California C-20 Warm-Air Heating, Ventilating and Air-Conditioning exam?

Computer-based, multiple choice with four answer choices and one best answer. 3½ hours for each exam, trade and Law & Business (CSLB exam FAQ). CSLB does not publish the number of questions or the passing score. Closed book: no reference materials; a calculator is provided. Most applicants also take the Law & Business exam (included free with every trade exam here).

What should I study first for the California C-20 Warm-Air Heating, Ventilating and Air-Conditioning exam?

Start with the largest sections, which carry the most points: Fabrication, Installation & Startup (38%), Planning & Estimating (22%), Troubleshooting, Repair & Maintenance (20%). Then take a timed mock exam and spend extra time on whatever scored lowest.

Do I also need the Law & Business exam?

Most applicants for this license also take the Law & Business exam. It is included with this course, so you can practice both.

Where can I practice for the California C-20 Warm-Air Heating, Ventilating and Air-Conditioning exam?

LicenseExamReady has 2,185 practice questions for the California C-20 Warm-Air Heating, Ventilating and Air-Conditioning exam and the Law & Business exam, full mock exams weighted like the real test, explanations that cite the code section or rule, and a readiness score. New accounts get a free 3-day trial.

Are practice questions the same as the real exam?

No. Licensing boards keep their exams confidential. Good practice questions are written from the official exam outline and code books and teach the rule behind each answer.

Practice for the California C-20 Warm-Air Heating, Ventilating and Air-Conditioning exam

2,185 practice questions, full-length timed mock exams weighted like the real test, explanations with sources, and a readiness score that shows when you're ready to book the exam.

LicenseExamReady is an independent study tool, not affiliated with Contractors State License Board. How our questions are made.