Arizona R-37R Plumbing (Residential) practice test
520 practice questions (R-37R trade + Statutes & Rules), with full mock exams weighted like the real AZ ROC exam, explanations with sources, and a readiness score.
What the exam covers
- Drainage, Waste & Vents16%
- Indirect Waste4%
- Water Supply Systems13%
- Backflow Prevention5%
- Roof Drains & Storm Drainage5%
- Plumbing Fixtures & Water Heaters7%
- General Knowledge & Regulations10%
- Specialty Plumbing, Interceptors & Traps5%
- Isometric Analysis5%
- Fuel Gas10%
- Septic & Sewer10%
- Fire Sprinklers5%
- Excavation5%
- 100 questions, 240 minutes, 70% to pass (PSI).
- Open book: 2018 IPC, IFGC and IMC, NFPA 13/13D/13R, A.A.C. Title 18 Ch. 9 and 29 CFR 1926.
Source: PSI content outline (R-37R)
Free sample questions
Cleanouts on piping 6 in and smaller need clearance in front of at least:
- 6 in
- 12 in
- 18 in
- 30 in
Show answer
C. 18 in — Rule (2018 IPC §708.1.9): cleanouts on 6 in and smaller pipes must be provided with a clearance of not less than 18 in for rodding, and cleanouts on 8 in and larger pipes a clearance of not less than 36 in. Cleanouts must also be accessible: not covered with cement, plaster or other permanent finish. Without that space, a drain-cleaning machine can't be inserted. 2018 IPC §708.1.9 (Cleanout clearance) ↗
An air break differs from an air gap in that the indirect pipe:
- Is sealed to the receptor
- Terminates below the flood rim of the receptor but is not sealed to it
- Is above the flood rim
- Has a check valve
Show answer
B. Terminates below the flood rim of the receptor but is not sealed to it — Rule (2018 IPC §802.3.2): an air break is an arrangement in which the indirect waste pipe terminates below the flood level rim of the receptor but above its trap seal, without being sealed to the receptor. An air gap (§802.3.1) requires the pipe to end above the flood level rim. An air break is less protective, so it is permitted only where the code specifically allows it. 2018 IPC §802.3.2 (Air break) ↗
PVC pipe may be used for:
- Hot water distribution
- Cold water service outside the building (not hot water)
- Gas piping indoors
- Vents only
Show answer
B. Cold water service outside the building (not hot water) — Rule (2018 IPC §605.3–§605.4, Tables 605.3 and 605.4): PVC pipe is listed for cold water service pipe outside the building (Table 605.3) but is not listed for water distribution pipe inside the building (Table 605.4), and it may never be used for hot water. CPVC, by contrast, is approved for both hot and cold water distribution. 2018 IPC Table 605.3 (water service pipe) ↗
Backsiphonage occurs when:
- Downstream pressure exceeds supply
- Negative pressure in the supply draws water backward
- Water is heated
- Vents are blocked
Show answer
B. Negative pressure in the supply draws water backward — Rule (IPC Chapter 2, definitions): backsiphonage is the backflow of water or other substances into the potable water supply caused by negative or reduced pressure (a partial vacuum) in the supply piping. It occurs, for example, when a water main breaks or a fire pumper draws heavily, siphoning water back from a submerged hose or fixture. Vacuum breakers protect against backsiphonage. (Standard trade practice — not set by a specific code section)
Splitting a $3,000 job into three $1,000 contracts to stay under the exemption limit is:
- Allowed
- Not allowed—the exemption doesn't apply to divided contracts or parts of a larger operation
- Allowed if the owner agrees
- Allowed for repairs only
Show answer
B. Not allowed—the exemption doesn't apply to divided contracts or parts of a larger operation — Rule (A.R.S. § 32-1121(A)(14)(b)): the exemption does not apply to work that is part of a larger or major operation, or to a contract that is divided into smaller amounts to stay under the $1,000 limit. Three $1,000 contracts for one $3,000 job require a license. A.R.S. §32-1121 (Persons not required to be licensed) ↗
Questions people ask
What is on the Arizona R-37R exam?
It is weighted by section: Drainage, Waste & Vents 16%, Indirect Waste 4%, Water Supply Systems 13%, Backflow Prevention 5%, Roof Drains & Storm Drainage 5%, Plumbing Fixtures & Water Heaters 7%, General Knowledge & Regulations 10%, Specialty Plumbing, Interceptors & Traps 5%, Isometric Analysis 5%, Fuel Gas 10%, Septic & Sewer 10%, Fire Sprinklers 5%, Excavation 5%.
What is the R-37R exam format?
100 questions, 240 minutes, 70% to pass (PSI). Open book: 2018 IPC, IFGC and IMC, NFPA 13/13D/13R, A.A.C. Title 18 Ch. 9 and 29 CFR 1926.
Are these the real exam questions?
No. Licensing boards keep their exams confidential. Our questions are written from the official exam outlines, study guides and code books, and each answer links to its source.
Is there a free trial?
Yes. Every new account gets 3 days of full access to every exam, with no card needed.
Independent study tool, not affiliated with AZ ROC. How our questions are made.