California C-39 Roofing practice test
1,353 practice questions (C-39 trade + Law & Business), with full mock exams weighted like the real CSLB exam, explanations with sources, and a readiness score.
What the exam covers
- Planning & Estimating22%
- Job Site Preparation13%
- Low-Slope Roofing17%
- Steep-Slope Roofing26%
- Safety22%
- Computer-based, multiple choice with four answer choices and one best answer.
- 3½ hours for each exam, trade and Law & Business (CSLB exam FAQ). CSLB does not publish the number of questions or the passing score.
- Closed book: no reference materials; a calculator is provided.
- Most applicants also take the Law & Business exam (included free with every trade exam here).
Source: CSLB C-39 study guide
Free sample questions
One roofing square equals:
- 10 sq ft
- 100 sq ft
- 1,000 sq ft
- 144 sq ft
Show answer
B. 100 sq ft — A roofing square is 100 square feet of roof surface. Roofing materials, labor and waste are estimated and priced in squares. (Standard trade practice — not set by a specific code section)
Attic insulation and occupants' belongings below a tear-off should be:
- Ignored
- Protected from falling debris (cover items, warn owners)
- Removed by the roofer always
- Wetted
Show answer
B. Protected from falling debris (cover items, warn owners) — During tear-off, debris and dust fall through gaps, especially on spaced sheathing. Warn the owners and have them cover or move belongings in the attic and rooms below. (Standard trade practice — not set by a specific code section)
Low-slope membranes should be lapped so that:
- Water runs against laps
- Water flows over laps, not into them (shingle fashion)
- Laps are vertical
- No laps exist
Show answer
B. Water flows over laps, not into them (shingle fashion) — Lap membranes shingle fashion, starting at the low point (drains or eaves) and working upslope, so water flows over the laps instead of into them. (NRCA Roofing Manual — industry reference, not a code (no free online text))
Vented attics generally need net free ventilation area of at least:
- 1/50
- 1/150 (or 1/300 with conditions) of attic floor area
- 1/1,000
- None
Show answer
B. 1/150 (or 1/300 with conditions) of attic floor area — Rule (CRC §R806.2): a vented attic needs net free ventilating area of at least 1/150 of the vented space. It may be reduced to 1/300 when a vapor retarder is installed in certain climate zones, or when 40–50% of the vent area is high (near the ridge) and the rest at the eaves. Calif. Residential Code §R806.2 (attic vent area) ↗
An active contractor license must be renewed every:
- 1 year
- 2 years
- 3 years
- 4 years
Show answer
B. 2 years — Rule (B&P §7140): an active contractor license expires two years from the last day of the month it was issued, so it must be renewed every 2 years. An inactive license is different: it is issued for 4 years (B&P §7076.5). Bus. & Prof. Code §7140 (licenses expire every two years) ↗
Questions people ask
What is on the California C-39 exam?
It is weighted by section: Planning & Estimating 22%, Job Site Preparation 13%, Low-Slope Roofing 17%, Steep-Slope Roofing 26%, Safety 22%.
What is the C-39 exam format?
Computer-based, multiple choice with four answer choices and one best answer. 3½ hours for each exam, trade and Law & Business (CSLB exam FAQ). CSLB does not publish the number of questions or the passing score. Closed book: no reference materials; a calculator is provided. Most applicants also take the Law & Business exam (included free with every trade exam here).
Are these the real exam questions?
No. Licensing boards keep their exams confidential. Our questions are written from the official exam outlines, study guides and code books, and each answer links to its source.
Is there a free trial?
Yes. Every new account gets 3 days of full access to every exam, with no card needed.